Rain

Extended Version: Non-Pr

Extended Version: Non-Pre
Extended Version: Non-Preemptive Scheduling of Flexible Loads in Smart Grids via Convex Optimization

arXiv:2503.04909v1 Announce Type: new
Abstract: This paper studies the scheduling of a large population of non-preemptive flexible electric loads, each of which has a flexible starting time but once started will follow a fixed load shape until completion. We first formulate the scheduling problem a…

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *